Yardize logo Yardize

Lot 19 Cromwell Street

Lot 19 Cromwell Street, Taroom QLD 4420, Australia

- Bedrooms
- Bathrooms
- Parking
174148 m² Land size
- Internal area

About this property

The parcel at 19 Cromwell Street in Taroom, Queensland, consists of roughly 174,148 m² of land. It is accessed directly from Cromwell Street and lies within a rural setting close to the town centre and surrounding agricultural amenities. The terrain reflects the typical landscape of the area, accommodating a variety of land‑use possibilities.

Key details

Locality
Taroom
State
QLD
GNAF PID
GAQLD161115623
Legal parcel ID
19/T506
Property type
Land
Land size
174148 m²
Internal area
-
Land Use Category
Residential

Nearby schools

Ordered by:
0.4 km
Secondary school | Catholic
9.7 km
Combined school | Government
10.3 km
Primary school | Catholic

Frequently asked questions

What is the total area of the land parcel?

The parcel covers 174,148 m², which is roughly 17.4 hectares of land.

How far is the parcel from the centre of Taroom?

It is located about 1 – 1.5 km from the town of Taroom, placing it within easy walking distance of the community.

Which major roads provide access to the parcel?

The Leichhardt Highway runs north‑south through Taroom, and the Roma‑Taroom Road joins from the south‑west, giving direct road access to the property.

What community facilities are nearby?

Within roughly 1.4 km you’ll find the Taroom Post Office, Taroom Library, and the historic Leichhardt Tree site, all offering basic services and local interests.

Is there an airport close to the land?

Taroom Airport is located about 20 km south‑east of the parcel and is used by private aircraft and emergency services.

Are any utilities such as water or electricity mentioned for the land?

The provided information does not specify the availability of utilities or services on the parcel.

What should potential owners consider regarding flooding?

Taroom has a history of Dawson River flooding, with major events recorded in 1890, 1956, 1983, 2010 and others, so flood risk should be assessed for any development.