86 Benny Street
86 Benny Street, Latrobe TAS 7307, Australia
Key details
- Locality
- Latrobe
- State
- TAS
- GNAF PID
A unique ID for this address in Australia's national address database.
- GATAS702199832
- Legal parcel ID
The official land parcel identifier used on property titles and plans.
- 140839/2
- Remoteness area
- Regional
- Property type
- House
- Land size
- 1223 m²
- Internal area
- -
- Land Use Category
What the land is mainly used for, such as Residential, Commercial, Industrial or Other.
- Residential
Real Estate Agencies
Nearby schools
Frequently asked questions
How many bedrooms does the house at 86 Benny Street have?
The property features three bedrooms. It is a typical family-sized home.
What is the size of the land associated with 86 Benny Street?
The house sits on a 1,223 m² block. This provides ample space for a garden or outdoor activities.
How far is 86 Benny Street from the centre of Latrobe?
The property is about 0.1 km from the heart of Latrobe, essentially within walking distance of the town’s main amenities.
What heritage sites are located near 86 Benny Street?
Several heritage places lie within 1.5 km, including Hamilton House, St Luke’s Anglican Church, the Masonic Temple, and a number of historic houses on Hamilton and Gilbert Streets.
Which community facilities are close to the property?
Mersey Community Hospital and the main shopping district on Gilbert Street, which hosts Supa IGA, cafés and restaurants, are both situated in Latrobe and are a short distance from the house. The town’s chocolate factory and the Australian Axemen’s Hall of Fame are also nearby.
What type of climate does Latrobe experience?
Latrobe enjoys an oceanic climate with mild, slightly drier summers, average maximum around 21.8 °C in February, and cool, wetter winters, average maximum about 12.9 °C in July. Annual rainfall averages roughly 767 mm over about 130 days.
Has Latrobe taken any measures to reduce flood risk?
Yes, following the 2016 floods the town built a flood‑mitigation system that includes a levee and diversion culvert. Construction started in 2022 and was completed in 2023.