6 Anear Court
6 Anear Court, Lutana TAS 7009, Australia
Key details
- Locality
- Lutana
- State
- TAS
- GNAF PID
A unique ID for this address in Australia's national address database.
- GATAS702185456
- Legal parcel ID
The official land parcel identifier used on property titles and plans.
- 27872/12
- Remoteness area
- Regional
- Property type
- House
- Land size
- 426 m²
- Internal area
- -
- Land Use Category
What the land is mainly used for, such as Residential, Commercial, Industrial or Other.
- Residential
Real Estate Agencies
Nearby schools
Frequently asked questions
What is the land area of 6 Anear Court?
The property sits on a 426 m² block, providing ample space for a modest family home.
How many bedrooms does the house have?
The residence features two bedrooms, suitable for a small household or couples.
Which parks or recreational spaces are nearby?
Apex Park, Rugby Park, and the Lutana Woodlands Reserve are all within about 0.3 km, offering play areas, open‑space walking and community facilities.
How close is the property to the Brooker Highway?
The Brooker Highway runs along the south‑western edge of Lutana, placing it very near the property and providing easy road access to surrounding areas.
Are there any environmental considerations for gardening at this location?
Soil testing in Lutana has shown elevated zinc, lead and cadmium near the surface. The 2009 CSIRO guidance recommends growing sensitive vegetables in raised beds with at least 30 cm of clean soil.
What is the historical background of the Lutana suburb?
Lutana developed around the Risdon Zinc Works from 1916, featuring early 20th‑century workers’ housing designed under garden‑city principles. The suburb was officially gazetted in 1961 and has since evolved into a mixed residential area.
Is there a proposed walking or cycling link near the property?
The former rail corridor, known as the “Lutana Link” or “Zinc Link,” has been proposed as a safe walking and cycling route connecting Lutana to Derwent Park and the Intercity Cycleway, though the project remains unbuilt as of 2025.